亚洲国产成人精品无码区在线网站|无码精品国产DVD在线观看久9|中文字幕av一区二区三区免费看|亚洲AV无码一区二区三区乱码z|婷婷激情五月一区二区三区播放中|久久久久久亚洲精品不卡性色av|亚洲午夜在线视频日韩国产一区二区

86 536 6132678
Home/Products/Box-type substations/Shandong Haichem photovoltaic power construction site

Shandong Haichem photovoltaic power construction site

Can achieve unmanned or few person on duty operation mode. Regular station maintenance personnel require 7-9 people, while integrated substations are unmanned and only 2-4 people are needed as needed.

Home/Products/Box-type substations/Shandong Haichem photovoltaic power construction site

Product Introduction

At present, the application of intelligent traction substations in China is still in its early stages. The vast majority of electrified railways currently in operation are mainly ordinary traction substations, and the equipment is not intelligent enough. The operation status is mainly judged and repaired manually, and the fault diagnosis and recovery of the entire power supply system are still mainly manual.

The intelligent traction integrated substation relies on high-tech means such as information digitization and communication platform networking. On the basis of automatically completing functions such as information collection, measurement, measurement, control, protection, and detection, it replaces traditional electrical signals with network data signals to achieve intelligent analysis functions such as data calculation, analysis, and report management. This is also different from traditional traction substations that can only achieve remote signaling, telemetry, and other functions There is a significant difference between remote control and remote adjustment.


Product features

① Reduce operation and maintenance costs: It can achieve unmanned or few person on duty operation mode. Regular station maintenance personnel require 7-9 people, while integrated substations are unmanned and only 2-4 people are needed as needed.

② Increase service life and improve power supply quality: It can simultaneously have functions such as receiving, transforming, transmitting, and protecting, without being affected by external environment, reduce power supply radius, improve power supply quality, and ensure that the product operates normally in an environment of -55 ℃ to+70 ℃. The service life of conventional stations is only 15-20 years, while the service life of integrated substations can be extended to 30 years.

③ Reduce product volume and footprint: This integrated substation integrates all equipment into a modular design and integration, which is only 30% of the conventional station volume. The footprint can be reduced from 11000 square meters to 3300 square meters, saving land and increasing efficiency, and with low operating and maintenance costs in the later stage.


  • Previous:no more
  • Next: American-style substations
  • 魯公網(wǎng)安備 37078102001141號(hào)

    潼南县| 乐昌市| 九江市| 类乌齐县| 石台县| 株洲县| 凤山市| 湾仔区| 虞城县| 平遥县| 达尔| 阿合奇县| 新昌县| 金山区| 古浪县| 赤水市| 肃宁县| 金乡县| 瑞丽市| 大宁县| 斗六市| 古蔺县| 东阿县| 邻水| 壤塘县| 凤山县| 额济纳旗| 鄱阳县| 西乡县| 尤溪县| 中卫市| 岫岩| 内黄县| 盱眙县| 宁国市| 诏安县| 余干县| 岚皋县| 甘洛县| 集安市| 通化县|